{"id":4272,"date":"2020-02-26T14:55:30","date_gmt":"2020-02-26T19:55:30","guid":{"rendered":"https:\/\/sites.udmercy.edu\/campusconnection\/?p=4272"},"modified":"2020-03-04T12:59:37","modified_gmt":"2020-03-04T17:59:37","slug":"renovation-in-the-news","status":"publish","type":"post","link":"https:\/\/sites.udmercy.edu\/campusconnection\/2020\/02\/26\/renovation-in-the-news\/","title":{"rendered":"Detroit Mercy McNichols Campus renovation in the news"},"content":{"rendered":"<div id=\"mm-0\" class=\"mm-page mm-slideout\">\n<div class=\"has-interstitial-ads-page\">\n<div class=\"dialog-off-canvas-main-canvas\">\n<div class=\"layout-container\">\n<div class=\"layout-content\">\n<div class=\"region region-content\">\n<article class=\"node node--type-article node--view-mode-full clearfix\">\n<div>\n<div class=\"layout-2col-8x4 clearfix article\">\n<div class=\"region-featured row\">\n<div class=\"region-featured-left col-xs-12 col-sm-12 col-md-12 col-lg-8\">\n<div class=\"block-region-content-left\">\n<div class=\"block block-ctools-block block-entity-fieldnodetitle\">\n<div class=\"content\">\n<h3>Facelift set to get underway at the University of Detroit Mercy.<\/h3>\n<p><em>WWJ-AM 950 Radio<br \/>\n<\/em>Feb. 29, 2020<\/p>\n<p><strong><a href=\"https:\/\/mms.tveyes.com\/Transcript.asp?StationID=2785&amp;DateTime=2%2F29%2F2020+8%3A08%3A07+AM&amp;Term=University+of+Detroit+Mercy&amp;PlayClip=TRUE\">Listen to WWJ&#8217;s newscast here<\/a><\/strong><\/p>\n<p>Transcript:<\/p>\n<p>A more than 100 million dollar facelift is set to get underway on the campus of the University of Detroit Mercy. Renovation and expansion of the Student Union plus demolition of the aging Fisher Administration Center and Reno Hall will begin in May.<\/p>\n<p>&#8220;And then we are going to shift gears when this project is all completed and begin to build two new student apartment complexes for our upper classmen. This will increase our student population living in residence halls from about 900 to about 1200 students.&#8221; UDM President, Dr. Antoine Garibaldi says all the work will take about 4 years to complete.<\/p>\n<h3 class=\"field field--name-title field--type-string field--label-hidden article-title h2\"><a href=\"https:\/\/www.crainsdetroit.com\/education\/detroit-mercy-overhaul-consolidate-campus-60-million-project\">Detroit Mercy to overhaul, consolidate campus in $60 million project<\/a><\/h3>\n<div id=\"mm-0\" class=\"mm-page mm-slideout\">\n<div class=\"has-interstitial-ads-page\">\n<div class=\"dialog-off-canvas-main-canvas\">\n<div class=\"layout-container\">\n<div class=\"layout-content\">\n<div class=\"region region-content\">\n<article class=\"node node--type-article node--view-mode-full clearfix\">\n<div>\n<div class=\"layout-2col-8x4 clearfix article\">\n<div class=\"region-featured row\">\n<div class=\"region-featured-left col-xs-12 col-sm-12 col-md-12 col-lg-8\">\n<div class=\"block-region-content-left\">\n<div class=\"block block-ctools-block block-entity-fieldnodefield-paragraphs\">\n<div class=\"field field--name-field-paragraphs field--type-entity-reference-revisions field--label-hidden article-paragraph field__items\">\n<div class=\"item--paragraph--type--body field__item\">\n<div class=\"block block-\">\n<div class=\"field--name-field-paragraph-body \">\n<p id=\"first-graph\" class=\"inline-ad-para\">Sweeping changes are in store for the University of Detroit Mercy&#8217;s McNichols campus, including the demolition of more than 100,000 square feet of building space and renovations to nearly every one of its other structures&#8230;.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p><em>Crain&#8217;s Detroit Business<\/em><br \/>\nFeb. 26, 2020<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h3>Major construction planned at the University of Detroit Mercy.<\/h3>\n<p><em>WWJ-AM 950 Radio<br \/>\n<\/em>Feb 26, 2020<\/p>\n<p><strong><a href=\"https:\/\/mms.tveyes.com\/Transcript.asp?StationID=2785&amp;DateTime=2%2F26%2F2020+11%3A44%3A34+AM&amp;Term=University+of+Detroit+Mercy&amp;PlayClip=TRUE\">Listen to WWJ&#8217;s newscast here<\/a><\/strong><\/p>\n<p>Transcript:<br \/>\nMajor construction planned at the University of Detroit Mercy. Administrators announced today that a multi-million dollar project for the McNichols campus will begin in July. The work will include a renovation and expansion of the Student Union followed by the eventual demolition of the University&#8217;s Fisher Administration Center and Reno Hall. The plan also calls for new on-campus apartments and a Center for Excellence in teaching and learning. The University says the upgrades will help business development in the area in northwest Detroit. News time 11:43.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Facelift set to get underway at the University of Detroit Mercy. WWJ-AM 950 Radio Feb. 29, 2020 Listen to WWJ&#8217;s newscast here Transcript: A more &hellip;<\/p>\n","protected":false},"author":65,"featured_media":4278,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[2217],"tags":[83],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/sites.udmercy.edu\/campusconnection\/wp-content\/uploads\/sites\/106\/2020\/02\/detroit20mercy20rendering_i.jpg?fit=792%2C372&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pbwnTV-16U","_links":{"self":[{"href":"https:\/\/sites.udmercy.edu\/campusconnection\/wp-json\/wp\/v2\/posts\/4272"}],"collection":[{"href":"https:\/\/sites.udmercy.edu\/campusconnection\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.udmercy.edu\/campusconnection\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.udmercy.edu\/campusconnection\/wp-json\/wp\/v2\/users\/65"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.udmercy.edu\/campusconnection\/wp-json\/wp\/v2\/comments?post=4272"}],"version-history":[{"count":8,"href":"https:\/\/sites.udmercy.edu\/campusconnection\/wp-json\/wp\/v2\/posts\/4272\/revisions"}],"predecessor-version":[{"id":4315,"href":"https:\/\/sites.udmercy.edu\/campusconnection\/wp-json\/wp\/v2\/posts\/4272\/revisions\/4315"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.udmercy.edu\/campusconnection\/wp-json\/wp\/v2\/media\/4278"}],"wp:attachment":[{"href":"https:\/\/sites.udmercy.edu\/campusconnection\/wp-json\/wp\/v2\/media?parent=4272"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.udmercy.edu\/campusconnection\/wp-json\/wp\/v2\/categories?post=4272"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.udmercy.edu\/campusconnection\/wp-json\/wp\/v2\/tags?post=4272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}